Jim finished the walls and ceiling, had the A/C installed, and burned the windowsills and bathroom door. We stayed in the shed for a couple nights while the camper was being worked on, I got a pic of how a “certified signed for delivery” package is delivered when you’re rural, and a turkey found the bird seed. Jim also installed the cabinets, built the half wall for coat hangers, and had the countertops installed before we left.














